After
having the silver Awlgrip paint job, the boat then has to wait
for one week to dry out properly. It is then moved to the finishing
shed for the last phase of the production run. All the upholstery
and graphics are now being fitted.
After
leaving the Sunseeker factory, the boat will then move to Sunseeker
Sales where it will have a Pre-Delivery Inspection before finally
being collected.
Now
on its Boatfloat which will keep it high and dry and ready to go.
For
the start of the 2007 season I fitted some FB Design suspension
seats.
Two
air vents were also fitted to help force more cool air into
the engine bay.