The
starboard fuel tank is now being fitted, in readiness for the
top deck to be installed. Once both fuel tanks have been installed,
the basic hull work is completed and the holes have been cut for
the various accessories, the top deck is then lifted and bonded
onto the hull. |
 |
After the top deck,
work starts on the installation of the teak decking. The TriMax
drive system and propellers are then fitted. Once the teak decking
is finished and the toilet installed, the pre-constructed centre
console can be lifted into place. Work then begins on the hydraulic
steering system and fiddly bits!. The engine bay is now finished
in readiness for the engines to be lifted in.
|
 |
 |
The
basic upholstery is fitted and then finally the engines are lifted
in and connected in preparation for the sea trials. |
 |
Here
she is - outside the Sunseeker Factory, waiting to go to sea for
the first time! Once the sea trials are completed successfully,
she will return to the Factory to be sprayed and the graphics
applied. |
 |
|